Mackay: [07] 4951 3883 Darwin: 0428 110 999

Energy and Audits

Cell completed a detailed Level2 energy consumption audit for the newly constructed resort to enable the operators to reduce operating costs and energy consumption. A technical report provided a number of design changes and solutions to meet the client requirements. Capital costing and forecast savings were reported as part of the deliverables. The recommendations were taken up by the resort and ongoing monitoring is in place. Cell owns and operates its own in-house data logging equipment for these types of projects.

Comments are closed.